Entries by kevincoulson

Update | February 16

Work on the stairwell inside the library (originally scheduled to begin around Feb. 7) has been delayed due to engineering concerns required on-site verification. However, the work should commence within the next few days so… expect loud noises. The stairwell is located on the east side of the Education Library (the side that is near the New Norman elevator) although noise will certainly carry throughout the area.